A major concern for the producer was the existing substrate and its coating which was covered in oily residue. This proved no challenge for the applicator MAN Construction who ensured good preparation and removed any remaining trace of the contaminants through washing and diamond grinding.
Meat processing and manufacturing sites need to ensure that the facility maintains the highest level of hygiene and safety. Approximately 650m2 of Flowfresh SR in a 4mm thickness was installed on the processing floor which delivered both an antimicrobial surface and nonslip platform underfoot.
The application was finished to a high standard thanks to the focus on good preparation and the quality installation of the fit-for-purpose polyurethane cement solution.